A local and independent building merchant, with a team of knowledgeable specialists who are ready to help with any of your trade and DIY projects! Putting forward a comprehensive range of stock.. they have everything you may need all in one place.
We Installed
- Installed 2X Project EV 32a SP Chargers (EVA-07S-SE-RFID) c/w 4G SIM cards
- Both chargers are controlled using RFID cards - NEW ground mounts and duct work from the fence line to both chargers
- Completed by Wold Construction - Installation of NEW cable tray along the fence line
- Prepped for the NEW EV-Ultra steel wired armoured to be installed - CT clamps installed to both chargers
- Providing dynamic load management
All of the chargers were set up and finished by Callum using the Project EV app
Smashed it again!
Swillington Primary School
Huge savings on their electricity bills over time and no more changing light bulbs, which means saving on maintenance costs too!
Find out more about the job below :
We Installed
- Replaced all of the old light fittings with brand new LED style lights.
- Installed new Steinel absence & presence detectors in most rooms with associated controls.
See the before and after the job was complete...
MKM Building Supplies
FLT Charger Supplies - Across 30 sites nationwide
After renewing their oldest Diesel Forklifts to brand new, environmentally friendly Lithium-Ion Battery powered machines, by our sister company Windsor Materials Handling. Windsor M&E were tasked with installing three phase electrical supplies needed to facilitate this. In some cases upgrading the electrical distribution system/installing a new three phase distribution board dedicated to the forklift chargers.
We Installed
- Galvanized tray work
- Steel wire armoured cabling
- Installation of a new three phase distribution board
- New FLT charger supplies
- New charger positions to the distribution board
- Installation of a new MCB within existing distribution board
- New metal enclosures
- New four pole RCCB's for additional protection
GJS Property Development
The developer was refurbishing and converting one large unit into 2 units, requiring us to do a full M&E package as detailed below:
Electrical works
- New electrical incomer
- 3 phase distribution
- Lighting including emergency lighting
- Small power
- EV chargers
- Data cabling
- Fire alarm system
- Door entry system
- CCTV and security alarm system
Mechanical works
- New gas incomer
- Hot and cold water supplies
- Sanitaryware
- Drainage
HVAC works
- Mechanical extraction to toilets
- Air to air heat pump
Windsor Materials Handling
The original T8 light fittings had started to fail and the client wanted to improve both the light level and reduce the energy consumption, in the workshop. We recommended LED fittings with occupancy sensors for each row, leading to:
Electrical works
- Improved lighting levels
- Over 50% reduction in energy consumption,
- Reduced CO2 emissions from the lighting of over 50%
- Saving over £1,900 p.a. on electricity alone
- Reduced maintenance costs of the lighting
- Quick payback on investment
Where we can help
Frequently Asked Questions
How often should I get my equipment serviced?
Depending on the equipment and legislation guidance, it is recommended that businesses commit to at least an annual check on mechanical and electrical equipment to keep compliant. HVAC and heat pumps can require more frequent preventative maintenance checks, typically bi-annually.